Trademarkia Logo

United Kingdom

£
Registered

on 30 Jun 2005

Last Applicant/ Owned by

Köster GmbH

Sutthauser Straße 280

Osnabrück, , 49080

Serial Number

UK00904516324 filed on 30th Jun 2005

Registration Number

UK00904516324 registered on
26th Jun 2006

Correspondent Information

BUSSE & BUSSE PATENT- UND RECHTSANWÄLTE PARTNERSCHAFT MBB

Grosshandelsring 6

Osnabrück,

49084

Last Planner

building materials of metal and tubes and pipes for building purposes, transportable buildings of metal. control apparatus, included in class 9, incl Read More

Classification Information


Class [6]
Metal Products


Building materials of metal and tubes and pipes for building purposes, transportable buildings of metal.

Class [9]
Computer & Software Products & Electrical & Scientific Products


Control apparatus, included in class 9, including for use in control stations and for the purpose of cathodic protection, gas detection installations for waste dumps, consisting of gas analysers and gasometers.

Class [19]
Non-Metallic Building Material Products


Asphalt, pitch and bitumen; non-metallic transportable buildings, non-metallic building materials and tubes and pipes for building purposes.

Class [36]
Insurance & Financial Services


Real estate and mortgage brokerage, real estate and housing management, real estate appraisal, renting of flats.

Class [37]
Construction and Repair Services


Road and street building including the manufacture of road surfaces of all kinds (including substructures) such as small and large paving, brick paving, concrete paving, macadam paving, bitumen and tarviated road coverings of all kinds, wood-block paving; earthworks including the necessary frost protection work and drainage measures; sports, play and parking area construction; hydraulic and civil engineering, landscaping; track building; kerb and kerb stone laying, manufacture of edge and bed surrounds, marginal strips, pavement fortifications, foot way and cycle track fortifications; manufacture, repair, maintenance and refurbishment of buildings in civil and underground engineering, including irrigating and drainage installations, clarifying installations, sanitation and supply conduits, drains, manholes, rain inlets, rain reservoirs, clarifying installation parts; laying of land and sea cables and track systems; manufacture of buildings in environmental technology including construction and reconstruction of waste tips and enlargement of rock caverns for storing toxic waste and hazardous materials; construction and civil engineering including designing and reconstruction of detached, semi-detached and multifamily residential structures, residential buildings, hospitals, industrial buildings and turnkey buildings; structural protective work to buildings, building and concrete repair work including surface protection; roof covering and building and repairing street, square and passage roofing; building and repairing pump stations for water and waste water, measuring and regulating stations for conveying water and gas, pressure raising stations for water, gas and industrial media; repair of machines, tools and equipment for building; demolition, sealing and dead sounding work; electric installation; facade cleaning; fireplace construction, tile laying, floor laying; building dehumidification; scaffolding; blasting; carpentry and timber lamination; installation of heating, air-conditioning, refrigerating and ventilating apparatus; cleaning of contaminated materials for the disposal, making safe and treatment of these materials in accordance with legal provisions.

Class [39]
Transportation & Storage Services


Storage of contaminated materials for the disposal, making safe and treatment of these materials in accordance with legal provisions.

Class [40]
Treatment & Processing of Materials Services


Surface treatment of contaminated materials for the disposal, making safe and treatment of these materials in accordance with legal provisions; disposal of contaminated materials through biological and/or chemical and/or physical processes.

Class [42]
Computer & Software Services & Scientific Services


Construction and design planning and consultancy; technical building project management; architectural and engineering services.

Mark Details


Serial Number

UK00904516324

Mark Type

Word

Kind of mark

Individual